This is the project of railway connecting  Moatize to Nacala, via Malawi including coal terminal in Nacala-à-velha. In this project CFM is in partnership with Vale, forming the company CLN (PPP – Public-Private Participation) that is the concessionaire of new logistics corridor stretches.

It is being built with the capacity to 30 MTPY, and at its start, it should have a 22 MTPY capacity at the railway line and 18 MTPY at the Coal Terminal. Date of commencement of export of coal is scheduled for late December 2015. The cost of the project is U$D 4.5 billion.