• Português

cfm logo

FacebookTwitterYoutube

  • Home
  • About CFM
    • The CFM
    • Message from the Chairman
    • Mission, Vision and Goal
    • Organization
    • Organization Structure
    • Shareholdings
    • CFM in the region
    • Políticas dos CFM
    • Historial
    • Brief History of CFM
    • Restructuring
    • Post-restructuring
    • 100 Anos da Estação dos CFM
    • Museu dos CFM
    • Relatorio e Contas 2023Achievements, economic and financial results of CFM in 2023.

      Download
      relatoriosmenu See previous editions

  • Infrastructures
    • CFM-North
    • Railways
    • Nacala-Cuamba Line
    • Cuamba-Lichinga Line
    • Cuamba-Entre Lagos Line
    • Port of Nacala
    • Bulk Liquids Terminal
    • General Cargo Quay
    • Containers Terminal
    • Port of Pemba
    • CFM-Center
    • Railways
    • Machipanda Line
    • Sena Line
    • Port of Beira
    • Containers and Multiple Purposes Terminal
    • General Cargo Quay
    • Fuel Terminal
    • Refrigerated Cargo Terminal
    • Port of Quelimane
    • CFM-South
    • Railways
    • Ressano Garcia Line
    • Goba Line
    • Limpopo Line
    • Port of Maputo
    • Fishing Pier
    • Cabotage Terminal
    • General Loading Dock
    • Molasses Loading Terminal
    • Citrus Terminal
    • Sugar Terminal
    • Containers Terminal
    • Steel Terminal
    • Matola Coal Terminal
    • Matola Bulk Terminal
    • Fuel Terminal
    • Matola Aluminium Terminal
  • Services
    • Handling of Cargo
    • Transport of Goods
    • Passenger Transport
  • Concessions
  • Projects
    • CFM North
    • CFM Center
    • CFM South
  • Documents and Media
    • Highlights
    • Report and Accounts
    • Annual Statistical Information
    • Tenders
    • Announcements
    • Xitimela Magazine
    • Other documents
    • Image Gallery
    • Train Schedules
    • Tarifa de Transporte de Passageiros
  • Social Responsibility
    • Education and Culture
    • Health
    • Sports
    • National Tourism
  • Contacts
    • General
    • CFM North
    • CFM Center
    • CFM South
    • International
  • Home
  • About CFM
    • The CFM
    • Message from the Chairman
    • Mission, Vision and Goal
    • Organization
    • Organization Structure
    • Shareholdings
    • CFM in the region
    • Políticas dos CFM
    • Historial
    • Brief History of CFM
    • Restructuring
    • Post-restructuring
    • 100 Anos da Estação dos CFM
    • Museu dos CFM
  • Infrastructures
    • CFM-North
    • Railways
    • Nacala-Cuamba Line
    • Cuamba-Lichinga Line
    • Cuamba-Entre Lagos Line
    • Port of Nacala
    • Bulk Liquids Terminal
    • General Cargo Quay
    • Containers Terminal
    • Port of Pemba
    • CFM-Center
    • Railways
    • Machipanda Line
    • Sena Line
    • Port of Beira
    • Containers and Multiple Purposes Terminal
    • General Cargo Quay
    • Fuel Terminal
    • Refrigerated Cargo Terminal
    • Port of Quelimane
    • CFM-South
    • Railways
    • Ressano Garcia Line
    • Goba Line
    • Limpopo Line
    • Port of Maputo
    • Fishing Pier
    • Cabotage Terminal
    • General Loading Dock
    • Molasses Loading Terminal
    • Citrus Terminal
    • Sugar Terminal
    • Containers Terminal
    • Steel Terminal
    • Matola Coal Terminal
    • Matola Bulk Terminal
    • Fuel Terminal
    • Matola Aluminium Terminal
  • Services
    • Handling of Cargo
    • Transport of Goods
    • Passenger Transport
  • Concessions
  • Projects
    • CFM North
    • CFM Center
    • CFM South
  • Documents and Media
    • Highlights
    • Report and Accounts
    • Annual Statistical Information
    • Tenders
    • Announcements
    • Xitimela Magazine
    • Other documents
    • Image Gallery
    • Train Schedules
    • Tarifa de Transporte de Passageiros
  • Social Responsibility
    • Education and Culture
    • Health
    • Sports
    • National Tourism
  • Contacts
    • General
    • CFM North
    • CFM Center
    • CFM South
    • International
Vinaora Nivo SliderVinaora Nivo SliderVinaora Nivo SliderVinaora Nivo SliderVinaora Nivo Slider

horarios

portal utilizador

Projecto de Expansão da Terminal de Contentores de Maputo

O Projecto visa acomodar o crescente tráfego nacional, regional e internacional de contentores. O projecto executivo está na fase de elaboração. O prazo de conclusão está previsto para 2015.

FaLang translation system by Faboba

Projects in CFM South

Projectos de Reablitação das Pontes na Linha de Ressano Garcia
Aquisição de 20 locomotivas para o CFM Sul e para o CFM Centro
Aquisição de 70 Carruagens para o Transporte de Passageiros destinadas ao CFM Sul e CFM Centro
Projecto de construção de ponte Ferroviária em Santa-Rita, desvio de Xinavane
Projecto de Reabilitação de Emergência da Ponte ao Km78+500 na Linha de Limpopo
Projecto de reabilitação da Ponte ao Km 49 na linha de Goba
Projecto de Reabilitação de 8 (oito) Pontes Ferroviárias na Linha de Ressano Garcia
Projecto de Reconstrução da Ponte ao Km37+700 na Linha de Goba
Expansão da Capacidade da Linha de Ressano Garcia
Projecto de Expansão da Terminal de Contentores de Maputo
Projecto Integrado do Porto de Techobanine
Projecto de Reabilitação e Expansão da Capacidade da Terminal de Petróleos da Matola
Reabilitação da Estação de Ressano Garcia
Reabilitação da Linha de Ressano Garcia
Reabilitação da Linha de Goba
Reabilitação do Ramal de Salamanga

Ambiente e Segurança no Trabalho

seguranca trabalho

CAPA Xitimela Ed 30

Relatorio e Contas 2023Report and Accounts
Achievements, economic and financial results of CFM in 2023.
Download

tarifa transporte passageiros

tarifas2023

porto de nacala manual

banner ferroviario 25

dadosestatisticos

regulamentodecontratacao


Services

  • Handling of Goods
  • Transport of Goods
  • Passenger Transport

Infraestrutures

  • General Vision
  • Railways
  • Port of Nacala
  • Port of Pemba
  • Port of Beira
  • Port of Quelimane
  • Port of Maputo

Documents and Media

  • Highlights
  • Report and Accounts
  • Tenders
  • Announcements
  • Xitimela Magazine
  • Photo Gallery
  • Train Schedules

History

  • Brief History of CFM
  • Restructuring
  • Post-restructuring
  • CFM Station 100th Annirvesary
  • CFM Museum

About CFM

  • Message from the Chairman
  • Mission, Vission and Goals
  • Organization
  • Organization Structure
  • Investee Companies
  • CFM in th region
  • Environment and Occupational Safety

Projects

  • CFM North
  • CFM Center
  • CFM South

Social responsability

  • Education and Culture
  • Health
  • Sports
  • National Tourism

Contacts

  • General
  • CFM North
  • CFM Center
  • CFM South
  • International

General Contacts

(+258) 825448100
(+258) 842370323

gci@cfm.co.mz

Praça dos Trabalhadores
Maputo - Moçambique

cfm footer logo© 2018 CFM - Portos e Caminhos de Ferro de Moçambique.
All Rights Reserved.

Concept and Design: DotCom