• Português

cfm logo

FacebookTwitterYoutube

  • Home
  • About CFM
    • The CFM
    • Message from the Chairman
    • Mission, Vision and Goal
    • Organization
    • Organization Structure
    • Shareholdings
    • CFM in the region
    • Políticas dos CFM
    • Historial
    • Brief History of CFM
    • Restructuring
    • Post-restructuring
    • 100 Anos da Estação dos CFM
    • Museu dos CFM
    • Relatorio e Contas 2023Achievements, economic and financial results of CFM in 2023.

      Download
      relatoriosmenu See previous editions

  • Infrastructures
    • CFM-North
    • Railways
    • Nacala-Cuamba Line
    • Cuamba-Lichinga Line
    • Cuamba-Entre Lagos Line
    • Port of Nacala
    • Bulk Liquids Terminal
    • General Cargo Quay
    • Containers Terminal
    • Port of Pemba
    • CFM-Center
    • Railways
    • Machipanda Line
    • Sena Line
    • Port of Beira
    • Containers and Multiple Purposes Terminal
    • General Cargo Quay
    • Fuel Terminal
    • Refrigerated Cargo Terminal
    • Port of Quelimane
    • CFM-South
    • Railways
    • Ressano Garcia Line
    • Goba Line
    • Limpopo Line
    • Port of Maputo
    • Fishing Pier
    • Cabotage Terminal
    • General Loading Dock
    • Molasses Loading Terminal
    • Citrus Terminal
    • Sugar Terminal
    • Containers Terminal
    • Steel Terminal
    • Matola Coal Terminal
    • Matola Bulk Terminal
    • Fuel Terminal
    • Matola Aluminium Terminal
  • Services
    • Handling of Cargo
    • Transport of Goods
    • Passenger Transport
  • Concessions
  • Projects
    • CFM North
    • CFM Center
    • CFM South
  • Documents and Media
    • Highlights
    • Report and Accounts
    • Annual Statistical Information
    • Tenders
    • Announcements
    • Xitimela Magazine
    • Other documents
    • Image Gallery
    • Train Schedules
    • Tarifa de Transporte de Passageiros
  • Social Responsibility
    • Education and Culture
    • Health
    • Sports
    • National Tourism
  • Contacts
    • General
    • CFM North
    • CFM Center
    • CFM South
    • International
  • Home
  • About CFM
    • The CFM
    • Message from the Chairman
    • Mission, Vision and Goal
    • Organization
    • Organization Structure
    • Shareholdings
    • CFM in the region
    • Políticas dos CFM
    • Historial
    • Brief History of CFM
    • Restructuring
    • Post-restructuring
    • 100 Anos da Estação dos CFM
    • Museu dos CFM
  • Infrastructures
    • CFM-North
    • Railways
    • Nacala-Cuamba Line
    • Cuamba-Lichinga Line
    • Cuamba-Entre Lagos Line
    • Port of Nacala
    • Bulk Liquids Terminal
    • General Cargo Quay
    • Containers Terminal
    • Port of Pemba
    • CFM-Center
    • Railways
    • Machipanda Line
    • Sena Line
    • Port of Beira
    • Containers and Multiple Purposes Terminal
    • General Cargo Quay
    • Fuel Terminal
    • Refrigerated Cargo Terminal
    • Port of Quelimane
    • CFM-South
    • Railways
    • Ressano Garcia Line
    • Goba Line
    • Limpopo Line
    • Port of Maputo
    • Fishing Pier
    • Cabotage Terminal
    • General Loading Dock
    • Molasses Loading Terminal
    • Citrus Terminal
    • Sugar Terminal
    • Containers Terminal
    • Steel Terminal
    • Matola Coal Terminal
    • Matola Bulk Terminal
    • Fuel Terminal
    • Matola Aluminium Terminal
  • Services
    • Handling of Cargo
    • Transport of Goods
    • Passenger Transport
  • Concessions
  • Projects
    • CFM North
    • CFM Center
    • CFM South
  • Documents and Media
    • Highlights
    • Report and Accounts
    • Annual Statistical Information
    • Tenders
    • Announcements
    • Xitimela Magazine
    • Other documents
    • Image Gallery
    • Train Schedules
    • Tarifa de Transporte de Passageiros
  • Social Responsibility
    • Education and Culture
    • Health
    • Sports
    • National Tourism
  • Contacts
    • General
    • CFM North
    • CFM Center
    • CFM South
    • International
Vinaora Nivo SliderVinaora Nivo SliderVinaora Nivo SliderVinaora Nivo SliderVinaora Nivo Slider

horarios

portal utilizador

Projecto de Construção da Nova Terminal de Carvão no Porto da Beira

Esta terminal visa garantir a exportação dos 20 MTPA de carvão que será escoado pela linha de Sena após a sua expansão de capacidade. A previsão de conclusão das Obras está marcada para o ano 2015.

FaLang translation system by Faboba

Projects in CFM Center

Projecto de Implantação de Portos Secos
Aquisição de 2 (dois) Rebocadores para o Porto da Beira
Reabilitação de 306 vagões de mercadorias do CFM-Centro
Reabilitação de Cais de Rebocadores do Porto da Beira
Projecto de Construção da Nova Terminal de Carvão no Porto da Beira
Expansão da Capacidade da Linha de Sena para 20 MTPA
Projecto do Corredor de Desenvolvimento de Chiúta (CDC )
Projecto de Ligação Centro e Norte através da Ferrovia entre Mutarara (Linha de Sena) e Mutuali (Linha de Nacala
Reabilitação do Porto de Quelimane
Construção de Oficina e Armazém da Terminal de Petróleos
Melhoria das Operações Marítimas do Porto da Beira
Dragagem de Emergência do Porto da Beira incluindo o seu Canal de Acesso
Projecto de Reabilitação do Sistema de Controlo de Circulações na Linha de Sena
Reabilitação de Emergência da Linha de Machipanda
Renovação dos Feixes de Recepção e Expedição que servem o Tráfego do Carvão de Moatize no Porto da Beira
Projecto Expansão de Capacidade da Linha de Sena

Ambiente e Segurança no Trabalho

seguranca trabalho

CAPA Xitimela Ed 30

Relatorio e Contas 2023Report and Accounts
Achievements, economic and financial results of CFM in 2023.
Download

tarifa transporte passageiros

tarifas2023

porto de nacala manual

banner ferroviario 25

dadosestatisticos

regulamentodecontratacao


Services

  • Handling of Goods
  • Transport of Goods
  • Passenger Transport

Infraestrutures

  • General Vision
  • Railways
  • Port of Nacala
  • Port of Pemba
  • Port of Beira
  • Port of Quelimane
  • Port of Maputo

Documents and Media

  • Highlights
  • Report and Accounts
  • Tenders
  • Announcements
  • Xitimela Magazine
  • Photo Gallery
  • Train Schedules

History

  • Brief History of CFM
  • Restructuring
  • Post-restructuring
  • CFM Station 100th Annirvesary
  • CFM Museum

About CFM

  • Message from the Chairman
  • Mission, Vission and Goals
  • Organization
  • Organization Structure
  • Investee Companies
  • CFM in th region
  • Environment and Occupational Safety

Projects

  • CFM North
  • CFM Center
  • CFM South

Social responsability

  • Education and Culture
  • Health
  • Sports
  • National Tourism

Contacts

  • General
  • CFM North
  • CFM Center
  • CFM South
  • International

General Contacts

(+258) 825448100
(+258) 842370323

gci@cfm.co.mz

Praça dos Trabalhadores
Maputo - Moçambique

cfm footer logo© 2018 CFM - Portos e Caminhos de Ferro de Moçambique.
All Rights Reserved.

Concept and Design: DotCom