Located at Pier 12, the modern oil terminal, opened in 1994, has the capacity to load and unload tankers of 500 to 50,000 DWT and 500 to 2,500 DWT, respectively. The terminal system consists of four pipelines: one for fuel, three for diesel, and one for jet oil and petroleum. This terminal handles 400 tons of fuel per hour and has an installed capacity of 3,000,000 tons per year.


